Line 2 (Chengdu Metro)

Line 2 of the Chengdu Metro (Chinese: 成都地铁2号线; pinyin: Chéngdū Dìtiě Èr Hào Xiàn) is the second line on the metro network in Chengdu, Sichuan. Line 2 is a crosstown northwest-southeast trunk route. This line serves the Chengdu East railway station. Line 2 began operation on September 16, 2012.[3] An 11 km long mostly elevated extension to Longquanyi began testing in April 2014 opened in October 2014.[4]

Line 2
2
Train of Line 2 at Xipu station
Overview
StatusOperational
OwnerChengdu
LocaleChengdu, China
TerminiXipu
Longquanyi
Stations32
Service
TypeRapid transit
SystemChengdu Metro
Services1
Operator(s)Chengdu Metro Limited
Daily ridership927,200 (2018 Peak)[1]
History
Opened16 September 2012 (2012-09-16)
Technical
Line length42.32 km (26.30 mi)
Number of tracks2
CharacterUnderground and Elevated
Track gauge1,435 mm (4 ft 8 1⁄2 in)
Route map

Hongguang depot
( Qingchengshan)
( Wangcongci – Lanjiagou )
Xipu 6 Chengguan railway
Tianhe Road T2
Baicao Road
Jinzhou Road 9
( Outer – Inner )
Jinke Road North
Crossing Chengdu Western ring railway
Yingbin Avenue
Chadianzi Bus Terminal
Yangxi Flyover
Yipin­tianxia 7
( Outer – Inner )
East Shuhan Road
Baiguolin
(Wansheng )
( Huilong – Huagui Road )
Chengdu University of TCM &
Sichuan Provincial People's Hospital
4 5
connects 4
(Xihe )
Tonghuimen
People's Park
connects 1
Tianfu Square 1
( Science City/Wugensong – Weijianian )
Chunxi Road 3
( Shuangliu West station – Chengdu Medical College )
Dongmen Bridge
Niuwangmiao 6
( Lanjiagou – Wangcongci )
Niushikou
Dongda Road 8
( Lianhua – Shilidian )
Tazishan Park
East Chengdu Railway Station 7
( Inner – Outer )
Chengdu East
Chengyu Flyover
Huiwangling
Honghe
Chengdu Institute of
Public Administration
9
( Inner – Outer )
Hongliu depot
Damianpu
Lianshanpo
Jiepai
Shufang
Longping Road
Longquanyi
Cross-platform interchanges between different train categories in Xipu station, Chengdu. The double track of Line 2 of Chengdu Metro is in the middle, while the double track of National rail transport system (Chengdu–Dujiangyan intercity railway) is on both sides, respectively. It is the first implementation of Cross-platform interchanges between different train categories in China.[2]

Opening timeline

SegmentCommencementLengthStation(s)Name
Chadianzi Bus Terminal — Chengdu Institute of Public Administration 16 September 2012 22.4 km (13.92 mi) 20 Phase 1
Xipu — Chadianzi Bus Terminal 8 June 2013 8.8 km (5.47 mi) 6 Phase 2 (eastern section)
Chengdu Institute of Public Administration — Longquanyi 26 October 2014 11.1 km (6.90 mi) 6 Phase 2 (western section)

Stations

Service
routes
Station name Connections Distance
km
Location
English Chinese
●● Xipu 犀浦 6  CG  0.00 0.00 Pidu
●● Tianhe Road 天河路 T2 1.85 1.85
●● Baicao Road 百草路  28  1.65 3.50
●● Jinzhou Road 金周路 9 2.20 5.70 Jinniu
●● Jinke Road North 金科北路 1.15 6.85
●● Yingbin Avenue 迎宾大道 1.05 7.90
●● Chadianzi Bus Terminal 茶店子客运站 0.90 8.80
●● Yangxi Flyover 羊犀立交 27 1.50 10.30
●● Yipin­tianxia 一品天下 7 0.85 11.15
●● East Shuhan Road 蜀汉路东 1.10 12.25
●● Baiguolin 白果林 1.25 13.50
●● Chengdu University of TCM &
Sichuan Provincial People's Hospital
中医大省医院 4 5 1.15 14.65 Qingyang
●● Tonghuimen 通惠门 0.85 15.50
●● People's Park 人民公园 10 17 0.85 16.35
●● Tianfu Square 天府广场 1 18 0.95 17.30
●● Chunxi Road 春熙路 3 16 1.40 18.70 Jinjiang
●● Dongmen Bridge 东门大桥 0.95 19.65
●● Niuwangmiao 牛王庙 6 0.80 20.45
●● Niushikou 牛市口 Chengdu BRT 1.60 22.05
●● Dongda Road 东大路 8 0.60 22.65
●● Tazishan Park 塔子山公园 1.15 23.80
●● East Chengdu Railway Station 成都东客站 7 20 ICW 1.65 25.45 Chenghua
●● Chengyu Flyover 成渝立交 0.80 26.25
●● Huiwangling 惠王陵 30 1.60 27.85 Longquanyi
●● Honghe 洪河 0.95 28.80
●● Chengdu Institute of Public Administration 成都行政学院 9 1.50 30.30
● Damianpu 大面铺 3.20 33.50
● Lianshanpo 连山坡 11 1.25 34.75
● Jiepai 界牌 1.25 36.00
● Shufang 书房 1.85 37.85
● Longping Road 龙平路 1.90 39.75
● Longquanyi 龙泉驿 1.70 41.45

Est. Completion

Est. Completion Phase # Starting station/Ending station Length (KM) stations
2012-9 Phase 1Chadianzi Bus TerminalChengdu Institute of Public Administration22.4720
2012-12 (opened on June 1, 2013) Phase 2 - West ExtensionXipuChadianzi Bus Terminal8.7386
2014-12 Phase 2 - East ExtensionChengdu Institute of Public AdministrationLongquanyi11.16

References

  1. 戴璐岭 (2018-09-22). "400万!成都地铁线网单日客运量再次刷新纪录". 四川新闻 (in Chinese). Retrieved 2018-10-14.
  2. "成灌快铁犀浦站正式开建". 成都市官方网站. 2009-08-26. Archived from the original on 2014-04-24. Retrieved 2013-08-08.
  3. 成都地铁2号线今日正式开通试运营. Archived from the original on December 19, 2012. Retrieved September 16, 2012.
  4. 阳博. "成都地铁2号线东延线 客车成功"带电"跑_四川在线". sichuan.scol.com.cn. Retrieved 2018-10-07.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.